What we have did this week was that we had started on the post-productions stage of the advert, what we had to do is that we had first uploaded the footage, to the editing programme of Final cut x , then we started to to stick together the footage into a time-line, we had then seen that the advert was 54 seconds and saw that we had to cut it down as we are doing , but so far got it down to 33 seconds, with the re-placement shots of the scene from second location.
What logistical challenges did you face and how did you overcome them?
We did not face an logistical challenges this week as we had orginsed everthing that we were going to do this week, had had remember the memory card, as this was a concenerbecuase it had in previouse project, but we had it.
What technical challenges did you face this week and how did you overcome them?
The technical challenges that we had faced this week was the process on creating a new project kept leading up to the time line of the previous work that we had did is that we did the documentary. We did not want to mix the footage and the sound file with the documentary as this would be harder to work around with, so what we had did is that we had closed and then open Final cut pro , on it own and has go to file and to new project, which had allowed us to get a clear time line.
What targets do you aim to achieve before your next entry?
What I would like to achieve next week is that we would like to film he ending and the beginning of the advert, which has it location at Ben`s house , we were unable to do it this week so we has pros-pone it to next week.We also what to continue to edit the advert, and would like to edit the sound and to recode and placed the dialogue towards the end.

No comments:
Post a Comment